Construction of a temporary pedestrian bridge at the Hadera train station

Job
Client

Israel Railways

Project management company

Orad Ltd.

Financial
Scope

Approximately 6,000,000 ₪

As part of the project we performed bridge works from steel construction
The bridge is built of 3 sections with a total length of about 70 meters.
The bridge was installed on 3 uprights with the uprights at the ends made of steel and featuring opening stairwells.
The central commissioner is made of reinforced concrete pillar.
The foundations were made by drilled and cast bentonite piles at the site and dipping piles for the protection of communication lines and operational passage.
In addition, we performed framing, flooring, paving, electrical and communications work